Featured Project

IREP Montgomery

Infinitus Energy was able to deliver a project to the City of Montgomery with high recovery rates not achievable by single stream recycling programs that rely on residents to sort, addressing the recycling needs of the Community without additional capital investment from the City.

Live feed from project site. Image updated every 20 minutes.

Project Information

IREP @ Montgomery is located at 1551 Louisville Street, on a 74+/- acre permitted industrial site in the City of Montgomery, Alabama. Phase one of the project is an advanced mixed materials recovery facility designed to receive and process all of the MSW collected by the City of Montgomery via a single bin collection format. The Advanced Mixed Materials Recovery Facility (“AMMRF”) is designed to sort out targeted materials to achieve up to an 85% recovery rate. The facility will have the capacity to process up to 225,000 tons per year of municipal solid waste (the “MSW”). Infinitus Energy was awarded the contract following a Request for Proposals (“RFP”) that was issued by the City of Montgomery.

  • Location: Montgomery, Alabama

  • Projected Opening: June 2014

Download project info sheet

Download Land-for-sale Information Sheet